Europe

CLIENT &
COUNTRY
SUMMARY PROJECT DESCRIPTION
COWI AS, Albania
Year-2011. He provided services for a World Bank project in Albania (“Feasibility Study & Preparation of Preliminary & Detailed Design for Bulk Water Supply Line to Durres Region”). For this mission he was tasked with confirming yield/quality of water abstractions from proposed well fields, the design of new abstraction facilities, assessment of groundwater potential with the aid of a groundwater model, and assistance with the preparation of inception and preliminary design reports.
GFA Consulting Group, Kosovo
Years 2009 & 2010. He worked on an EU-funded river basin management project. This project provided institutional support to the Ministry of Environment and Spatial Planning (MESP), and River Basin Authorities in Kosovo. Mr Ashworth was tasked (KE-3) with implementing the EU Water Framework Directive’s (WFD) rules and procedures for groundwater in Drini River Basin. Main responsibilities included the delineation and characterisation of groundwater bodies, the execution of plans for creating a monitoring network (for groundwater levels and water quality), and the introduction of procedures and tools to characterize the quantitative and chemical status of groundwater. These activities were aided by training programs and a groundwater pilot project.
Assignments Prior to Year-1990 are not included